Hebei Yugang Pipe Supports The First Phase Of The Water Supply Pipeline Project For The Second Water Plant Of The South-to-North Water Diversion Project

During the construction of the South-to-North Water Diversion Project, a century-long project, Hebei Yugang Pipeline's 3PE anti-corrosion steel pipes were used in the construction of water supply pipelines for sections of the first phase of the middle route of the South-to-North Water Diversion Project, supporting supporting projects such as the first phase of the Second Water Plant. The company provided high-quality pipe products, supporting the construction of over 2,500 kilometers of water transmission pipelines, ensuring efficient water transportation from south to north and significantly improving regional water supply and ecological security.

 

Product Attributes:

Product Name: TPEP Anti-corrosion Steel Pipe

Specifications: Spiral steel pipe φ1420*18mm, 3PE outer layer, epoxy powder coating inner layer

Standards: Steel pipe complies with GB/T9711-2017, outer wall complies with GB/T23257-2017 (Polyethylene Anti-corrosion Coating for Buried Steel Pipes), inner wall complies with CJ/T120-2016 (Plastic-coated Composite Steel Pipe for Water Supply)

 

1
2

 

High-Quality Engineering Capabilities:

Superior Corrosion Resistance: Groundbreaking anti-corrosion technology with a design life of 50 years, setting a new industry benchmark

Immense Pressure Resistance: DN3600 ultra-large diameter application, with a pressure resistance exceeding 1.5 times the national standard

Ecological Safety: Food-grade epoxy inner wall is NSF-certified, ensuring 100% water quality compliance

Intelligent Construction: Equipped with automated welding technology, over 2.5 kilometers of pipeline can be laid in a single day

With a leakage rate of less than 0.5% per kilometer, 3PE steel pipes have become the "rust-proof lifeline" for the South-to-North Water Diversion Project. To date, they have ensured the pollution-free delivery of over 60 billion cubic meters of clean water!